Return to course: Tallwood 1
Tallwood 1
Classement
Quiz
Quiz TallWood 1
TallWood 1 Quiz
1. In what year was the firm’s main office established in Vancouver?
*
2015
2016
2017
2018
2. How many buildings does the company currently operate in?
*
One
Two
Three
Four
3. What is one of the key benefits of mass timber construction?
*
It is heavier than concrete
It has lower embodied carbon
It requires more on-site labor
It takes longer to build
4. Which city has the highest seismic activity where a mass timber project was built?
*
Toronto
Vancouver
Langford
Ottawa
5. What was one of the main challenges faced during the Langford project?
*
Supply chain delays
Lack of workforce
Construction during the pandemic
No proper building codes
6. What material is commonly used alongside CLT panels in hybrid structures?
*
Glass
Aluminium
Steel
Fiberglass
7. What advantage does prefabrication provide in mass timber construction?
*
Increases construction time
Reduces quality control
Minimizes noise pollution
Increases material waste
8. What was a key goal of the Quayside Toronto project?
*
To build the tallest timber skyscraper
To create the first zero-carbon neighborhood in Canada
To replace all steel structures with mass timber
To eliminate prefabrication in construction
Why do different timber manufacturers produce varying panel sizes?
*
Due to different tree species and cutting methods
Because timber expands over time
Because of fluctuating market demand
Because larger panels are illegal in Canada
10. What is a significant challenge when designing mass timber connections?
*
Timber cannot support heavy loads
Different connection types impact performance and fire resistance
All timber connections require welding
Connections are universal and work the same for all projects
Course Overview