Oakville Fire Station 8

Woodworks

The Town of Oakville selected an Integrated Project Delivery (IPD) method for the design and construction of a new 11,450 ft2 (1064 m2) fire station. Design objectives for Oakville Fire Station 8 (OFS) specified that the building should promote staff retention, optimize efficiencies and layout flexibility, and incorporate appropriate and durable construction materials and building systems. The new facility was required to consider life cycle costs and be easy to operate and maintain. Solutions provided by the design team were innovative and cost efficient, providing value to the town. The project pursued sustainable construction methodologies to mitigate climate risk and achieve the LEED silver certification target. The layout and design of the fire station, utilizes space efficiently, accommodating two full fire crews, two captains, two fire trucks and storage space for spare fire apparatus.

Related Publications

WoodWorks at The Buildings Show 2026
June 23, 2026
Premium
Free
Uncategorized
WoodWorks at BUILDEX 2027
June 9, 2026
Premium
Free
Events
#b99949
Wood Design & Building Magazine, vol 25, issue 103
June 1, 2026
Premium
Free
Magazine
Wood Solutions Conference: Calgary 2026
June 1, 2026
Premium
Free
Events
Wood Solutions Conference: Moncton 2026
May 8, 2026
Premium
Free
Events
#000000
Mass Timber Insurance Action Plan Phase 1 Report
April 29, 2026
Premium
Free
Design Guides & Resources
#005f46
Tall Wood Feasibility Study
April 27, 2026
Premium
Free
Case Studies
1
2
3

Get Access to Our Resources

Stay in the loop and don’t miss a thing!

What’s Your Occupation?

Help us personalize the content for you.

What Interests You the Most?

Help us personalize the content for you.

Filters

Expertise Icon
Field of Expertise
Province Icon
Province
Member Type Icon
WoodWork National Partners